Cady continues to lie about Arrowrock

The Boise Project Board of Control released the Arrowrock Feasibility Study to FERC when they applied for their last extension on March 13, 2003. The "completed feasibility study" was submitted to FERC. 

Frank Cady still tells the public that this Feasibility Study is NOT COMPLETE.   Frank Cady also lied to the public that LMUD needed to invest $150,000 in a study that already existed. A study that ended the Arrowrock project for LMUD.

The Boise Project Board of Controls ended LMUD's "exclusitivity" in December of 2001.........

 Cady 2/13/03 letter

LMUD commissioned RW Beck to review the Feasibility Study.  Frank Cady told the public that this report was not complete. The Boise Project Board of Control released RW Beck's report to FERC.  This review of the completed Arrowrock Feasibility Study was completed and released  in October 2001. LMUD lost their exclusitivity with the Boise Project Board of Controls in December 2001 based on the conclusions of the Feasibility Study.